We were awarded prestigious Contract Jobs for Fabrication & Erection of Steel Structure by samsung for their DFCU & HDPE Plant – OPaL, DAHEJ. We had proved our capacity to fabricate Structural l Steel, @ 821.5mt, at Samsung Opal Project.

At GFL Dahej, for Project, total @ 2.37 lacs inch - Dia piping was fabricated and erected in a record time frame. The highest 45500 inch - dia was fabricated in one single month. The average works out to be approximately 1750 inch - dia per day.

At SAMSUNG OPal Project, with close coordination and planning, we were able to erect 130m & 66m of Structure Modules, 13m x 13m x 13.5m height, with the help of 440 MT Crane. Total Height of Structure was 56 m from Ground & 26 m from Building top. We were the first contractor to complete the Project with in the time frame. We had also erected One Rotary Dryer weighing 240 MT, Two Nos Reactors each weighing 165 MT & Extruder System of Equipment weighing total 313 MT.

Being located in t h e fastest growing industrial hub, Dahej. Manpower resources a major area of concern as lots of industries of all constraint we were able to mobilize more than 725 manpower for a GFL- Dahej Expansion Project That indicates our commitments to complete the project as per schedule. At a given time we are in a posit ion to mobilize more than 2000 manpower to fulfill the requirements.